POL-010 - Requirements For Volatile Organic Compounds (VOC) Management Plans
01 April 2010
Marine Notice 04/2010
TO: SUBJECT: Reference: | ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND AUTHORIZED CLASSIFICATION SOCIETIES Requirements for Volatile Organic Compounds (VOC) Management Plans a) Maritime Regulation 2.37
|
PURPOSE:
This Notice provides guidance to vessel owners, operators and managers in the development of Volatile Organic Compounds (VOC) Management Plans to meet the requirements of MARPOL revised Annex VI, regulation 15.6, requires that all tankers carrying crude oil have on board and implement a VOC Management Plan approved by the Administration. The purpose of the Plan is to ensure that VOC emissions from tanker operations to which revised Annex VI/15.6 applies are prevented or minimized as much as possible.
APPLICABILITY:
The requirement applies to all oil tankers of 400 GT and above carrying crude oil.
1.0 REQUIREMENTS
1.1 The requirement that oil tankers carrying crude oil have on board and implement a shipspecific VOC Management Plan approved by the Administration takes effect from July 1, 2010. The VOC Management Plan shall be prepared in accordance with MARPOL regulation 15.6 of revised Annex VI, taking into account guidelines contained in resolution MEPC.185(59), Guidelines for the Development of a VOC Management Plan and MEPC.1/Circ.680, Technical Information on Systems and Operation to Assist Development of VOC Management Plans, references (c) and (d), respectively.
1.2 The VOC Management Plan must be reviewed and approved by the Administration. In keeping with current policy, Liberia has also authorized the classification society organizations it has recognized (RO) to review and approve VOC Management Plans on its behalf.
1.3 An approved VOC Management Plan is required prior to obtaining a MARPOL IAPP Certificate issued by a recognized organization on behalf of the Administration.
2.0 VOC MANAGEMENT PLAN PREPARATION, REVIEW AND APPROVAL
2.1 PREPARATION: The VOC Management Plan should be prepared taking into account the guidelines in, references (c) and (d).
2.2 The Administration has developed a model VOC Management Plan to assist ship-owners and operators in preparing their VOC Plan(s) and is available on request. The model Plan will simplify the preparation of a VOC Management Plan and may be structured as outlined below:
Cover Page
Particulars of the Vessel
Introduction
Index of Sections
Section 1: | Main features of Marpol 73/78, revised Annex VI, Regulation 15 |
Section 2: | Description of the Ship’s equipment and arrangements |
Section 3: | Procedures for minimizing VOC emissions during cargo loading |
Section 4: | Procedures for minimizing VOC emissions during sea passage |
Section 5: | Procedures for minimizing VOC emissions during discharge of cargoes |
Section 6: | Person responsible for implementing the Plan |
Section 7: | Monitoring and Control of VOC releases |
Section 8: | Training Program |
Section 9: | Information |
Section 9.1: | Cargo tank information/plans
|
Section 9.2 | References
|
2.3 Each plan shall as a minimum:
- be specific to the ship for which it is prepared;
- provide written procedures for minimizing VOC emissions during the loading and sea passage;
- give consideration to the additional VOC generated during Crude Oil Washing;
- identify a person responsible for implementing the Plan;
- If the ship is equipped with VOC reduction devices or equipment, the use of these devices or equipment should be incorporated into the procedures as appropriate; identify training, and
- be evaluated, reviewed and updated regularly.
- The Plan shall be available in a working language understood by the master and officers, if the working language is not English.
- Each Plan must identify the ship to which it applies, using the ship's name, call sign, port of registry, IMO number and deadweight.
- Best Management Practices: VOC Management Plan should encourage and set forth the following best management practices:
- The loading procedures should take into account potential gas releases due to low pressure and, where possible, the routing of oil from crude oil manifolds into the tanks should be done so as to avoid or minimize excessive throttling and high flow velocity in pipes;
- The ship should define a target operating pressure for the cargo tanks. This pressure should be as high as safely possible and the ship should aim to maintain tanks at this level during the loading and carriage of relevant cargo;
- When venting to reduce tank pressure is required, the decrease in the pressure in the tanks should be as small as possible to maintain the tank pressure as high as possible;
- The amount of inert gas added should be minimized. Increasing tank pressure by adding inert gas does not prevent VOC release but it may increase venting and therefore increased VOC emissions; and
- When crude oil washing is considered, its effect on VOC emissions should be taken into account. VOC emissions can be reduced by shortening the duration of the washing or by using a closed cycle crude oil washing program.
3.0 REVIEW AND APPROVAL
3.1 All VOC Management Plans are required to be approved by the Administration or an RO. The Plan that is submitted for approval by the Administration shall be in English. To facilitate the review and plan approval process, it is recommended to complete the checklist in Appendix I to this notice and used by the Administration for plan approval and attach it to the submitted plan. The checklist identifies the applicable sections of the VOC Management Plan, taking into account references (c) and (d) and the revised Annex VI/15.6.
3.2 The VOC management Plan should be sent to the Office of the Deputy Commissioner of Maritime Affairs, Republic of Liberia, Liberian International Ship & Corporate Registry, LLC, Attn: Marine Safety, 8619 Westwood Center Dr., Suite 300 Vienna, Virginia 22182, USA, Telephone: + 1 703 251 2469, Telefax: + 1 703 790 5655.
Questions regarding this instruction, MARPOL requirements, and fees for VOC
Management Plan review and approval should be referred to E-mail: safety@liscr.com.
* * * * *
APPENDIX I
Liberian International Ship and Corporate Registry
VOLATILE ORGANIC COMPOUND (VOC) MANAGEMENT PLAN REVIEW CHECKLIST
VESSEL NAME: DATE: ___/___/____
REVIEWER: ____________________________________________ COMPANY: ______________________
References: 1. Regulation 15, Annex VI (MARPOL 73/78) 2. Liberian Maritime Regulation 2.37
Guidelines: 1. IMO Resolution MEPC.185 (59)
- IMO MEPC.1/Circ.680
- IMO MSC/Circ.585
- Marine Notice POL-010
SECTIONS | VESSEL PARTICULARS | Yes | No | Comments |
Cover Page, Ship Particulars, Approval Page, Revision Page, and Index Page |
| . | ||
| ||||
Vessel Vapour Control Equipment Available | Vessel Equipments Available:
|
Inquiries concerning the subject of this Notice should be directed to the Office of the Deputy Commissioner, Republic of Liberia, the Liberian International Ship & Corporate
Registry, LLC, 8619 Westwood Center Dr., Suite 300, Vienna, VA 22182, USA
SECTION 1 | INTRODUCTION | |
Introduction Statement?
| ||
SECTION 2 | VOC MANAGEMENT PLAN – MAIN FEATURES OF REGULATION 15 ANNEX VI OF MARPOL73/78 | |||||
MARPOL 73/78 Regulation 15 Annex VI?
| ||||||
SECTION 3 | VESSEL VOC MANAGEMENT EQUIPMENT AND ARRANGEMENTS | Yes | No | Comments | ||
3.1 Introduction Page | 1.1 Introductory statement that provides an outline and describes the particulars of ship’ equipment and arrangements necessary to enable implementation of operational procedures for preventing or minimizing VOC emissions? 1.2 Arrangement of the ship & description of its cargo tanks with line or schematic drawings and heating arrangements, if provided. | |||||
3.2 Description of Cargo Tanks and Lines, Pressure/Vacuum equipments, and Relief devices | 1. Description of cargo tank venting arrangements?
| |||
2. Description of pressure control and over/under pressure alarms?
| ||||
3. Settings for Pressure/Vacuum (P/V) relief devices?
| ||||
SECTION 4 | OPERATIONAL PROCEDURES FOR MINIMIZING VOC EMISSIONS – LOADING OF CARGO | Yes | No | Comments |
4.1 Introduction Page | 1. Introductory statement that provides an outline and describes the cargo loading procedures, including best practices, methods and systems for the control of VOC emissions during cargo loading operations? |
4.2 Description of procedures for minimizing VOC emissions during loading of cargo | 1. Best practices and design to include?
| |||
2. A description of the system, method of operation and equipment parameters applied to control VOC emissions during cargo loading, should be given in this section of the Plan.
| ||||
3. Loading procedure should take into account potential gas releases due to low pressure and, where possible, the routing of oil from crude oil manifolds into the tanks should be done so as to avoid or minimize excessive throttling and high flow velocity in pipes? | ||||
4. Vessel should define a target operating pressure for the cargo tanks. This pressure should be as high as safely possible and the ship should aim to maintain tanks at this level during the loading and carriage of relevant cargo? |
SECTION 5 | OPERATIONAL PROCEDURES FOR MINIMIZING VOC EMISSIONS – SEA PASSAGE | Yes | No | Comments |
5.1 Introduction Page | 1. Introductory statement that provides an outline and describes the best practices, methods and systems for the control of VOC emissions during sea passage? | |||
5.2 Description of procedures for minimizing VOC emissions during sea passage | 1. Best practices and design to include?
| |||
2. A description of the system, method of operation and equipment parameters applied to control VOC emissions during sea passage, should be given in this section of the Plan?
| ||||
3. Vessel should define a target operating pressure for the cargo tanks. This pressure should be as high as safely possible and the ship should aim to maintain tanks at this level during the loading and carriage of relevant cargo? | ||||
4. Cargo temperature - A description of cargo heating requirements to maintain the vapour/liquid equilibrium should be included? |
SECTION 6 | OPERATIONAL PROCEDURES FOR MINIMIZING VOC EMISSIONS – DISCHARGING OF CARGO AND BALLASTING | Yes | No | Comments |
6.1 Introduction Page | 1. Introductory statement that provides an outline and describes the cargo discharging procedures, including best practices, method and systems for the control of VOC emissions when discharging cargo or ballasting? | |||
6.2 Description of procedures for minimizing VOC emissions when discharging cargo or ballasting | 1. Best practices and design to include (whichever applicable)?
| |||
| ||||
SECTION 7 | DESIGNATED PERSON – RESPONSIBLE FOR PLAN IMPLEMENTATION | Yes | No | Comments |
7.1 Identification of Designated Responsible Person | 1. A person shall be designated to assume overall charge of the VOC management onboard the ship? | |||
2. The designated person qualification requirement? At least one year’s experience on crude oil tankers where his duties have included all cargo handling operations relevant to VOC management. In the absence of experience with VOC management, he or she shall have completed a training program in VOC management in as specified in this manual? |
7.2 Designated Person Qualification? |
| |||
SECTION 8 | MONITORING AND CONTROL OF VOC RELEASES | Yes | No | Comments |
8.1 Monitoring and Recordkeeping of VOC releases |
| |||
SECTION 9 | TRAINING PROGRAM | Yes | No | Comments |
9.1 Description of Training Program | The VOC Management Plan should contain description of training program that include training requirements for all persons involved and responsible for the VOC management onboard the ship. The VOC management training program should cover and not be limited to the following:
|
- Ship specific methods and system for the control of VOC emissions
| |||||
SECTION 10 | VESSEL SPECIFIC INFORMATION | Yes | No | Comments | |
10.1 Vessel Plans and Drawings | The following Plans/Drawings must be included in the VOC Management Manual?
| ||||
SECTION 11 | REFERENCES | Yes | No | Comments | |
11.1 List of References used for the development of VOC Management Plan | The following list of reference documents must be included in the VOC Management Manual?
| ||||
SOLAS 6 | II-2, Regulation 11.6 Protection of cargo tank structure against pressure or vacuum in tankers | ||||
6.1 | General The venting arrangement shall be so designed and operated as to ensure that neither pressure nor vacuum in cargo tanks shall exceed design parameters and be such as to provide for: | ||||
1. | The flow of the small volumes of vapour, air, or inert gas mixtures caused by thermal variations in a cargo tank in all cases through pressure/vacuum valves; and | ||||
11.2 Extract reference from SOLAS II-2, Regulation 11.6 | 2. 6.2 1. 2. 6.3 | The passage of large volumes of vapour, air or inert gas mixtures during cargo loading and ballasting, or during discharging. Openings for small flow by thermal variations Openings for pressure release in 6.1.1 shall: have a great height as is practicable above the cargo tank deck to obtain maximum dispersal of flammable vapours, but in no case less than 2 m above the cargo tank deck; and be arranged at the furthest distance practicable, but no less than 5 m, from the nearest air intakes and openings to enclosed spaces containing a source of ignition and from deck machinery and equipment which may constitute an ignition hazard. Anchor windlass and chain locker openings constitute an ignition hazard. Safety measure in cargo tanks 6.3.1 Preventive measures against liquid rising in the venting system Provisions shall be made to guard against liquid rising in the venting system to a height which would exceed the design head of cargo tanks. This shall be accomplished by high-level alarms or overflow control systems or other equivalent means, together with independent gauging devices and cargo tank filling procedures. For the purpose of this regulation, spill valves are not considered equivalent to an overflow system. 6.3.2 Secondary means for pressure/vacuum relief A secondary means of allowing full flow relief of vapour, air or inert gas mixtures shall be provided to prevent over-pressure or under-pressure in the event of failure of the arrangements in paragraph 6.1.2. Alternatively, pressure sensors may be fitted in each tank protected by the arrangement required in paragraph 6.1.2, with a monitoring system in the ship’s cargo control room or the position from which cargo operations are normally carried out. Such monitoring equipment shall also provide an alarm facility which is activated by detection of over-pressure or under-pressure conditions within a tank. 6.3.3 Bypasses in vent mains Pressure/vacuum valves required by paragraph 6.1 may be provided with a bypass arrangement when they are located in a vent main or masthead riser. Where such an arrangement is provided there shall be suitable indicators to show whether the | |||
bypass is open or closed. 6.3.4 Pressure/vacuum-breaking devices One or more pressure/vacuum- breaking devices shall be provided to prevent the cargo tanks from being subject to:
Such devices shall be installed on the inert gas main unless they are installed in the venting system required by SOLAS II-2 regulation 4.5.3.1 or on individual cargo tanks. The location and design of the devices shall be in accordance with regulation 4.5.3 and paragraph 6. | |||||
6.4 | Size of vents outlets Vent outlets for cargo loading, discharging and ballasting required by paragraph 6.1.2 shall be designed on the basis of the maximum designed loading rate multiplied by a factor of at least 1.25 to take account of gas evolution, in order to prevent the pressure in any cargo tank from exceeding the design pressure. The master shall be provided with information regarding the maximum permissible loading rate for each cargo tank and, in the case of combined venting systems, for each group of cargo tanks. |